Case Studies

Very Large Installation Challenge

Problem: Our hospitality partner was awarded the largest and most sought after contracts in the industry.  The job required installing 65,000 wireless devices in over 2,600 hotel rooms using union electricians, not professional installers, with an extremely aggressive schedule.

Solution: Develop a system that flawlessly commissioned all of the wireless devices before being installed.  This methodology enabled the electricians to focus on installing the devices and keeping to schedule.

Fortune 500 Product For Two Wireless Standards

Problem: A company was looking to make two wireless modules for their product using both Z-Wave and ZigBee wireless standards.  They had a very short timeline in order to get to market as fast as possible.

Solution:  In order to speed development and reduce costs a design was made that reused a significant portion of the development between the two wireless modules.  The module was able to be finished on-time and was certified by both wireless standards.

Product Certification for Wireless Roll-Out

Problem: A Company needed to verify their wireless products would perform to their level of quality they are use to providing for other everyday products.

Solution: BuLogics put together a comprehensive testing plan that fully tested real world scenarios.   The long term goal of the program was achieved in continual reducing certification costs for new products.

 

Comments are closed.